伟德国际1946bv官网-源自英国始于1946

QQ
TELEPHONE
020-32225635
MESSAGE
WECHAT
TOP
Your Current Location:
Home
>
Case
>
Wenzhou Kundong Substation,Zhejiang
Wenzhou Kundong Substation,Zhejiang

Product: JiameiHD

Application: Facade

Quantity:3700m²

Project Profile:The building facade of the substation abandons the monotony of the traditional substation building, pursues innovation, boldly adopts etnit high-density full-body color fiber cement board, "yellow, gray, black and white" four colors, well-proportioned, like "beating notes", full of design sense, modern sense and sense of rhythm. The power distribution unit building is of assembled steel structure, and the ettenet high density full-body colored fiber cement board is fixed on the keel skeleton through the rivets. The whole process of dry construction is convenient and quick, which is very suitable for the assembled steel structure building. Eternit high density full-body color fiber cement board has excellent performance of fire prevention, waterproof, heat preservation and heat insulation, which can ensure safe and good use environment for the equipment in the station room.
XML 地图